Aluminum soffit work is completed on The Horizon Model Center.

brigon5oct03


Interior insulation is completed on The Horizon Model Center.

brigonhorizon1sept03


 

Roof shingles are installed on The Horizon Model Center.

brigonhorizon5sept03


 

Electrical wiring is completed for The Horizon Model Center.

brigonhorizon3sept03


 

Plumbing lines are installed in The Horizon Model Center.

brigonhorizon2sept03

 


HVAC ductwork completed on The Horizon Model Center.

091003


 

Brigon Homes is pleased to announce “The Jewel,”  our newest home design. Features included in The Jewel will be posted soon. In the meantime, please feel free to review the floorplan and elevation sketches for this new home by clicking on the picture below.

brigon1oct03


 

Concrete pool foundation installed for The Horizon Model Center.

090803

 


 

Windows and exterior doors installed on The Horizon Model Center.

090503


 

Interior framing of The Horizon Model Center is completed.

brigonframe1

brigonframe4