The Horizon – Update 6
Shelving in the kitchen pantry is installed.
Installation of wallpaper in The Horizon Model Center master bathroom continues.
The security system installation is complete.
Hardware is installed on the front doors.
The pool surfacing is complete.
The air handler is installed
Plumbing hardware is installed in the kitchen and master bathroom shower.
The concrete driveway is poured.
Concrete work continues on The Horizon Model Center. The front sidewalk is completed.
Construction of the pool cage is completed.
Installation of flooring tile is completed in The Horizon Model Center.
The intercom and home music system installation is complete.
Grading work in progress around the pool area.
Pool decking is completed.
Lanai deck is completed.
Installation of the master bathroom tub progresses on The Horizon Model Center. Wall tile installation in the shower is completed.
Countertop installation is completed in the master bathroom.
Wall tile is completed in the guest bathroom.
Tile flooring installed in the foyer.