Shelving in the kitchen pantry is installed.

brigonq5


 

Installation of wallpaper in The Horizon Model Center master bathroom continues.

brigong1


 

The security system installation is complete.

brigong7


 

Hardware is installed on the front doors.

brigong8


 

The pool surfacing is complete.

brigong4


 

The air handler is installed

brigong9


 

Plumbing hardware is installed in the kitchen and master bathroom shower.

brigong6

brigong2


 

The concrete driveway is poured.

brigonr11


 

Concrete work continues on The Horizon Model Center. The front sidewalk is completed.

brigonr12


 

Construction of the pool cage is completed.

brigonr13


 

Installation of flooring tile is completed in The Horizon Model Center.

brigond4


 

The intercom and home music system installation is complete.

brigond2


 

Grading work in progress around the pool area.

brigond1


 

Pool decking is completed.

brigond


 

Lanai deck is completed.

brigond3


 

Installation of the master bathroom tub progresses on The Horizon Model Center. Wall tile installation in the shower is completed.

brigon4nov03


 

Countertop installation is completed in the master bathroom.

brigon7nov03


 

Wall tile is completed in the guest bathroom.

brigon3nov03


 

Tile flooring installed in the foyer.

brigon14nov03